1
Items 22 and 23 — WAY LEAVE AND DISPOSAL OF SCRAPमद 22 और 23 — मार्गाधिकार और रद्दी का निपटान
Item 22 grants way leave facilities or easement rights.
- PCE: FULL POWERS
- DRM: FULL POWERS, WITHOUT any further delegation
- Divisional and headquarters officers: NIL
- Finance concurrence IS necessary
- Granting a way leave for an UNREASONABLY LONG stretch over or across railway land should be avoided
- That is particularly so for OBLIQUE crossings
- Where it is unavoidable, the bare minimum railway land parallel to the track should be used
- ITEM 23 — DISPOSAL OF UNSERVICEABLE AND SCRAP MATERIAL
- It disposes of unserviceable and scrap material, other than scrap WOODEN SLEEPERS, by tender or auction
- PHOD/HOD: FULL POWERS; DRM, ADRM, CWM or SAG: FULL POWERS
- Chairman/RRB: FULL POWERS, subject to the extant guidelines on preservation and destruction
- Divisional officers: FULL POWERS; the CMS and ADMOs in charge of health units: FULL POWERS
- Finance concurrence is necessary
- It is resorted to when the freight and loading charges of sending the material to a Stores Depot run too high
- That is, when they are out of proportion to the value that may be realised
- The departments take the PRIOR APPROVAL OF THE COS
- Empties are disposed of at their own station, by auction or on tender basis
- The authority is PARA 2314 of the Stores Code Volume II
- पीसीई: पूर्ण शक्तियाँ
- मंडल रेल प्रबंधक: पूर्ण शक्तियाँ, आगे किसी प्रत्यायोजन के बिना
- मंडल और मुख्यालय अधिकारी: शून्य
- वित्त सहमति आवश्यक है
- रेल भूमि पर या उसके आर-पार अनुचित रूप से लंबे खंड के लिए मार्गाधिकार देना टालना चाहिए
- तिरछी क्रॉसिंग में तो विशेष रूप से
- जहाँ यह अपरिहार्य हो, वहाँ पटरी के समानांतर कम से कम रेल भूमि का उपयोग हो
- मद 23 — अनुपयोगी और रद्दी सामग्री का निपटान
- यह अनुपयोगी और रद्दी सामग्री, रद्दी लकड़ी के स्लीपरों को छोड़कर, निविदा या नीलामी से निपटाती है
- पीएचओडी/एचओडी: पूर्ण शक्तियाँ; मंडल रेल प्रबंधक, एडीआरएम, सीडब्ल्यूएम या एसएजी: पूर्ण शक्तियाँ
- अध्यक्ष/आरआरबी: पूर्ण शक्तियाँ, परिरक्षण और विनाश के प्रचलित दिशानिर्देशों के अधीन
- मंडल अधिकारी: पूर्ण शक्तियाँ; स्वास्थ्य इकाइयों के प्रभारी सीएमएस और एडीएमओ: पूर्ण शक्तियाँ
- वित्त सहमति आवश्यक है
- यह तब किया जाता है जब सामग्री भंडार डिपो भेजने का भाड़ा और लदान प्रभार बहुत ऊँचा पड़े
- अर्थात् जब वे मिलने वाले मूल्य के अनुपात से बाहर हों
- विभाग सीओएस का पूर्व अनुमोदन लेते हैं
- खाली पात्र अपने ही स्टेशन पर, नीलामी या निविदा के आधार पर, निपटाए जाते हैं
- प्राधिकार भंडार संहिता खंड II का पैरा 2314 है
2
Items 24 and 25 — STRUCTURES, GUNNY BAGS AND WASTE PAPERमद 24 और 25 — संरचनाएँ, बोरे और रद्दी कागज
Item 24(A) sells redundant buildings or structures not required by the railway, through tender or auction.
- PCE: FULL POWERS; HOD: FULL POWERS
- DRM or CWM: FULL POWERS; divisional and headquarters officers: NIL
- Finance concurrence is necessary, and the authority is item 41 of the GM's delegation
- ITEM 24(B) — EMPTY GUNNY BAGS
- Sale of empty gunny bags through tender or by auction
- DRM, ADRM, CWM or SAG: FULL POWERS; divisional officers: FULL POWERS
- Finance concurrence is NOT necessary, and the authority is PARA 2319 of the Stores Code Volume II
- ITEM 25 — SALE OF WASTE PAPER
- DRM, ADRM, CWM or SAG: FULL POWERS; divisional officers: FULL POWERS
- Finance concurrence is NOT necessary
- The value realised is credited to SUNDRY EARNINGS under head Z.670
- The sale is effected on tender or by auction
- The authority is PARA 2409A of the Stores Code Volume II
- पीसीई: पूर्ण शक्तियाँ; एचओडी: पूर्ण शक्तियाँ
- मंडल रेल प्रबंधक या सीडब्ल्यूएम: पूर्ण शक्तियाँ; मंडल और मुख्यालय अधिकारी: शून्य
- वित्त सहमति आवश्यक है, और प्राधिकार महाप्रबंधक के प्रत्यायोजन की मद 41 है
- मद 24(B) — खाली बोरे
- खाली बोरों की बिक्री निविदा या नीलामी से
- मंडल रेल प्रबंधक, एडीआरएम, सीडब्ल्यूएम या एसएजी: पूर्ण शक्तियाँ; मंडल अधिकारी: पूर्ण शक्तियाँ
- वित्त सहमति आवश्यक नहीं, और प्राधिकार भंडार संहिता खंड II का पैरा 2319 है
- मद 25 — रद्दी कागज की बिक्री
- मंडल रेल प्रबंधक, एडीआरएम, सीडब्ल्यूएम या एसएजी: पूर्ण शक्तियाँ; मंडल अधिकारी: पूर्ण शक्तियाँ
- वित्त सहमति आवश्यक नहीं है
- प्राप्त मूल्य शीर्ष Z.670 के अंतर्गत विविध आय में जमा होता है
- बिक्री निविदा या नीलामी से की जाती है
- प्राधिकार भंडार संहिता खंड II का पैरा 2409A है
3
Item 26 — WRITE-OFF OF LOSSES OF STORESमद 26 — भंडार की हानियाँ बट्टे खाते डालना
Part (A) writes off losses of stores, tools and plant, and it divides by responsibility.
- WHERE A RAILWAY EMPLOYEE IS NOT RESPONSIBLE
- PHOD or CAO/CN: up to RS 2 LAKH in each case; HOD: up to Rs 1 lakh
- DRM, ADRM or CWM: up to Rs 2 lakh in each case; SAG officers: up to Rs 50,000 in each case
- Divisional and headquarters officers: up to Rs 5,000 in each case
- WHERE A RAILWAY EMPLOYEE IS RESPONSIBLE
- PHOD or CAO/CN: up to RS 1 LAKH in each case; HOD: up to Rs 50,000 in each case
- DRM, ADRM or CWM: up to Rs 1 lakh in each case; SAG officers: up to Rs 50,000 in each case
- Divisional and headquarters officers: up to Rs 1,000 in each case
- THE NOTES
- Finance concurrence is necessary for more than Rs 1,000 in each case
- Losses may arise due to accidents, theft or stores verification
- A REPORT goes to the Railway Board
- In a theft case the FINAL ENQUIRY REPORT of the police is required
- That is excepted only where it is definitely known that the case would prolong
- LOSSES OF CASH are not written off except with the sanction of the GENERAL MANAGER
- The authority is PARA 1102 and PARA 1113 of the Financial Code Volume I, with item 44 of the GM's delegation
- जहाँ कोई रेल कर्मचारी जिम्मेदार न हो
- पीएचओडी या सीएओ/सीएन: हर मामले में 2 लाख रुपये तक; एचओडी: 1 लाख रुपये तक
- मंडल रेल प्रबंधक, एडीआरएम या सीडब्ल्यूएम: हर मामले में 2 लाख रुपये तक; एसएजी अधिकारी: हर मामले में 50,000 रुपये तक
- मंडल और मुख्यालय अधिकारी: हर मामले में 5,000 रुपये तक
- जहाँ कोई रेल कर्मचारी जिम्मेदार हो
- पीएचओडी या सीएओ/सीएन: हर मामले में 1 लाख रुपये तक; एचओडी: हर मामले में 50,000 रुपये तक
- मंडल रेल प्रबंधक, एडीआरएम या सीडब्ल्यूएम: हर मामले में 1 लाख रुपये तक; एसएजी अधिकारी: हर मामले में 50,000 रुपये तक
- मंडल और मुख्यालय अधिकारी: हर मामले में 1,000 रुपये तक
- नोट
- हर मामले में 1,000 रुपये से अधिक पर वित्त सहमति आवश्यक है
- हानियाँ दुर्घटना, चोरी या भंडार सत्यापन से उठ सकती हैं
- रेलवे बोर्ड को रिपोर्ट जाती है
- चोरी के मामले में पुलिस की अंतिम जाँच रिपोर्ट आवश्यक है
- इसका अपवाद केवल वहाँ है जहाँ निश्चित रूप से ज्ञात हो कि मामला लंबा खिंचेगा
- नकदी की हानि महाप्रबंधक की स्वीकृति के बिना बट्टे खाते नहीं डाली जाती
- प्राधिकार वित्त संहिता खंड I का पैरा 1102 और पैरा 1113 है, महाप्रबंधक के प्रत्यायोजन की मद 44 के साथ
4
Items 26(B) and 27 — FUEL DIFFERENCES AND DEMURRAGEमद 26(B) और 27 — ईंधन का अंतर और विलंब शुल्क
Part 26(B) writes off the difference between the invoiced quantity and the issued quantity of coal, coke and HSD oil at main depots.
- COM: up to 2% for COAL AND COKE, and up to 0.1% for DIESEL
- DRM or CWM: up to 2% for coal and coke, and up to 0.05% for diesel
- Finance concurrence is necessary above Rs 1,000
- The reduction in quantity due to TEMPERATURE VARIATION between the loading point and the receiving point is NOT written off
- It is recovered from the OIL COMPANIES, as the agreement provides
- Losses beyond the stipulated percentages need thorough investigation for remedial action
- ITEM 27 — DEMURRAGE ON RAILWAY COAL LOADS
- (A) Demurrage due from FUEL HANDLING CONTRACTORS: COM or CCM FULL POWERS; DRM or ADRM FULL POWERS
- Divisional officers: up to Rs 200 in each case WITHOUT finance concurrence
- The same officers: above Rs 200 and up to Rs 1,000 in each case WITH finance concurrence
- (B) Demurrage due to DEPARTMENTAL reasons: COM or CCM FULL POWERS; DRM or ADRM FULL POWERS; the divisional column NIL
- Finance concurrence is necessary, and the authority is the Board's letters of 10.09.1982 and 23.04.1986
- सीओएम: कोयला और कोक में 2% तक, और डीजल में 0.1% तक
- मंडल रेल प्रबंधक या सीडब्ल्यूएम: कोयला और कोक में 2% तक, और डीजल में 0.05% तक
- 1,000 रुपये से ऊपर वित्त सहमति आवश्यक है
- लदान स्थल और प्राप्ति स्थल के तापमान के अंतर से आई मात्रा की कमी बट्टे खाते नहीं डाली जाती
- वह करार के प्रावधान के अनुसार तेल कंपनियों से वसूली जाती है
- तय प्रतिशतों से आगे की हानियों की गहन जाँच होती है, ताकि सुधार की कार्रवाई हो
- मद 27 — रेल कोयला लदान पर विलंब शुल्क
- (A) ईंधन संभालने वाले ठेकेदारों से देय विलंब शुल्क: सीओएम या सीसीएम पूर्ण शक्तियाँ; मंडल रेल प्रबंधक या एडीआरएम पूर्ण शक्तियाँ
- मंडल अधिकारी: बिना वित्त सहमति हर मामले में 200 रुपये तक
- वही अधिकारी: वित्त सहमति के साथ 200 रुपये से ऊपर और हर मामले में 1,000 रुपये तक
- (B) विभागीय कारणों से देय विलंब शुल्क: सीओएम या सीसीएम पूर्ण शक्तियाँ; मंडल रेल प्रबंधक या एडीआरएम पूर्ण शक्तियाँ; मंडल का स्तंभ शून्य
- वित्त सहमति आवश्यक है, और प्राधिकार बोर्ड के 10.09.1982 तथा 23.04.1986 के पत्र हैं