1
Paras 215 to 217 — ASSESSMENT OF WORKING EXPENSES/AVERAGE ANNUAL COST OF SERVICEपैरा 215 से 217 — संचालन व्यय/सेवा की औसत वार्षिक लागत का आकलन
• Para 215
(A) The AVERAGE ANNUAL COST OF SERVICE of an asset is the sum of four items.
- (a) The average annual cost of OPERATION
- (b) The average annual cost of MAINTENANCE AND REPAIRS
- (c) The annual DEPRECIATION charges
- (d) The annual INTEREST charges on the asset's cost
- Paras 216 and 217Traffic costing data is used, separating direct or variable costs from indirect, fixed or semi-variable ones.
- INCREMENTAL COSTS suit small increases in traffic over the short run
- FULLY DISTRIBUTED COSTS would be unreasonable to apply in every case
- LONG TERM VARIABLE COSTS, by the percentages in Annexure A, are the realistic and somewhat conservative approach
- (a) परिचालन की औसत वार्षिक लागत
- (b) अनुरक्षण और मरम्मत की औसत वार्षिक लागत
- (c) वार्षिक मूल्यह्रास प्रभार
- (d) परिसंपत्ति की लागत पर वार्षिक ब्याज प्रभार
- पैरा 216 और 217यातायात लागत आँकड़ों का प्रयोग होता है, प्रत्यक्ष या परिवर्ती लागतों को अप्रत्यक्ष, स्थिर या अर्ध-परिवर्ती से अलग करके।
- वृद्धिशील लागतें अल्पकाल में यातायात की छोटी वृद्धि के लिए उपयुक्त हैं
- पूर्ण वितरित लागतें हर मामले में लगाना अनुचित होगा
- अनुलग्नक A के प्रतिशतों से दीर्घकालिक परिवर्ती लागतें यथार्थवादी और कुछ रूढ़िवादी तरीका हैं
2
ANNEXURE Aअनुलग्नक A
CHECK LIST FOR PROJECT ESTIMATESपरियोजना प्राक्कलनों की जाँच सूची
Annexure A guides zonal railways and the Board's branches in costing projects.
The Board's Cost Analysis Cell found working expenses substantially UNDERSTATED in survey reports.
- Empty haulage, marshallings and tare tonne kilometres had been left out
- Some railways used the OPERATING RATIO, which is only an end figure and must NOT be used to estimate working expenses
- GROUP 'A' — ALL-TRACTION unit costs, including overheads
- GROUP 'B' — costs per shunting engine hour, train engine hour and so on, used for savings in engine and wagon hours
- GROUP 'C' — TRACTION-WISE costs, the most refined, with wagon provision costs shown separately
- BFRs, oil tanks, BOBs and special types, and POL, iron ore and steel plant raw material — 100 PER CENT
- COAL on broad gauge — 80 PER CENT; other commodities on broad gauge — 23 PER CENT; metre gauge, coal included — 33 PER CENT
- खाली ढुलाई, मार्शलिंग और टेयर टन किलोमीटर छोड़ दिए गए थे
- कुछ रेलों ने परिचालन अनुपात का प्रयोग किया, जो केवल अंतिम आँकड़ा है और संचालन व्यय आँकने में प्रयोग नहीं होना चाहिए
- समूह 'A' — सभी कर्षण की इकाई लागतें, उपरिव्यय सहित
- समूह 'B' — प्रति शंटिंग इंजन घंटा, गाड़ी इंजन घंटा आदि की लागतें, इंजन और माल डिब्बा घंटों की बचत के लिए
- समूह 'C' — कर्षणवार लागतें, सबसे परिष्कृत, माल डिब्बा प्रावधान लागत अलग दिखाकर
- बीएफआर, तेल टैंक, बीओबी और विशेष प्रकार, और पीओएल, लौह अयस्क और इस्पात संयंत्र कच्चा माल — 100 प्रतिशत
- बड़ी लाइन पर कोयला — 80 प्रतिशत; बड़ी लाइन पर अन्य वस्तुएँ — 23 प्रतिशत; मीटर लाइन, कोयला सहित — 33 प्रतिशत